Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Field 3 reinforced embankment construction
  • Field 2 attenuation tank 1.018 construction
  • Excavation and enabling works for Field 1 attenuation tank 1.030 construction
  • Tank 1.036 retaining wall construction
  • Managing surface water run off (Weather dependant)

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Field 3 reinforced embankment construction
  • Field 2 attenuation tank 1.018 construction
  • Excavation and enabling works for Field 1 attenuation tank 1.030 construction
  • Tank 1.036 retaining wall construction
  • Managing surface water run off (Weather dependant)

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Field 3 reinforced embankment construction
  • Field 2 attenuation tanks installation
  • Field 1 capping beam and deadman anchor wall construction
  • Tank 1.036 retaining wall construction

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Continued installation of utilities within field 1
  • Field 1 footway installation
  • Installation of the capping beam and dead-man anchor to the installed contiguous piled retaining wall
  • Commencement of the field 1 embankment
  • Piling to the field 2 attenuation tank
  • Enabling works associated with the field 1 substation
  • Continuation of field 3 reinforced embankment

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Continued installation of utilities within field 1
  • Installation of contiguous piled retaining wall to the field 1 embankment
  • Recommencement of works to the field 3 reinforced embankment at The Spinney end of site

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Operating surface water runoff measures (weather dependent)
  • Installation of utilities (water and electrics) in field 1 footway
  • Installation of land drainage road crossings in Field 1
  • Installation of additional road crossing ducts for utilities in Field 1
  • Alterations to drainage in Field 1
  • Recommencement of Field 3 embankment

Breheny Civil Engineering Ltd are planning to undertake and supervise the following works during this month:

  • Operating surface water runoff measures (weather dependent).
  • Field 3 embankment construction.