Anticipated Construction Works planned during September 2022:
![](https://rdcpublic.blob.core.windows.net/website-uploads/2023/01/RDC-Housing-LOGO-MASTER-RGB-1024x385.png)
![](https://rdcpublic.blob.core.windows.net/website-uploads/2022/12/20220909_105801-1024x768.jpg)
![](https://rdcpublic.blob.core.windows.net/website-uploads/2022/12/20220915_095207-1024x768.jpg)
Breheny Civil Engineering Ltd are planning to undertake the following works during this month:
- Carriageway kerbs installation and surfacing (Phase 1)
- Continue with topsoil strip and reduced dig in Fields 2 & 3
- Commence drainage installation in Field 2
- Removal of muckaway
- Materials delivery